28/6 Thursday
- Pitching idea to cilent's design team to get feedback and guide on material use and overall structure size.
29/6 Friday
- Draft out measurement of robot and structure to build a prototype.
- Plan to have discussion and building prototype on Monday.
2/7 Monday
- Meeting up to build prototype to check on the size of the structure and robot on the comfirmed design.
Discussions
Become a Hackaday.io Member
Create an account to leave a comment. Already have an account? Log In.