Assembly
So I finally got my Ruben's tube working. As there are many instructions online, I will not go into many details. Basic steps I took:
- Drill 96 holes each 2mm in diameter and 20mm distance apart alongside the top of the pipe.
- Weld one side of the steel pipe shut.
- Weld two small steel pipes, 10mm in diameter and approximately 50mm in length, into the steel pipe for connecting the gas tubes.
- Sealed the other end of the steel tube with a surgical glove and duct tape forming a rubber membrane.
- Connected grill gas supply to the steel pipe by splitting one gas tube coming from the pressure adapter into two and connecting each of them to the small welded-in pipes.
- Placed a Bluetooth speaker in front of the membrane.
Discussions
Become a Hackaday.io Member
Create an account to leave a comment. Already have an account? Log In.