I got done cutting out the pulley discs and drilling them and mounting them to the thumb tacks and gluing them in place with 401 glue using a sewing needle tip as the applicator. They all are reasonably square and solidly in place I think. Everything is moving freely. Everything seems lined up okay. I then mounted them all to the 2430 bldc motor.
These thumb tack based pulleys still need to be lashed down well and the lashings (upholstery thread) need to be coated in 401 glue to make them stiff and solid. I also need to add pulley discs to the 2430 bldc motor that are to line up well with the pulley disc slots the string is to go to. I then need to wind up the string sections themselves, loading up the system in preparation for actual testing.
Discussions
Become a Hackaday.io Member
Create an account to leave a comment. Already have an account? Log In.