Project Log — Stardate 1Dot22Dot25
R3 Master / R4 Slave configuration is operational. Primary system objectives have been met and baseline functionality is confirmed. Minor firmware anomalies remain and are currently under evaluation.
Network connectivity is established; however, after extended operational periods the connection becomes intermittent and may disengage unexpectedly.
System startup sequence is presently order-dependent. The R4 Slave must be powered prior to the R3 Master for proper clock output to render on the Ender-3 Pro display.
Automatic external temperature updates are functional but exhibit inconsistent refresh behavior, indicating a possible synchronization or timing issue between devices.
An alpha release of both firmware components will be published shortly to support collaborative review, testing, and external input.
Overall system status remains stable. Continued observation and incremental firmware refinement are in progress.