By replacing capital-intensive subsea civil works with existing platform drawworks and substituting custom high-pressure compressors with COTS marine-foam-filled HDPE drums, OBESS achieves rapid deployment with zero subsea construction. The system stores energy by winching buoyant payloads downward and generates stable 60Hz grid power upon release using standard offshore wind power conversion hardware.
Files
DOE STEP submission .pdf
The whitepaper
Adobe Portable Document Format -
100.19 kB -
08/12/2026 at 16:10