• Just the start

    Josh • 2 hours ago • 0 comments

    Work in progress!

    This was assembled in a rush from stuff I had laying around as I just wanted to get forging. 

    Next up is:

    • Add and wire up the missing fan
    • Tidy up internal wiring
    • Hose clamps!
    • Sort out the reservoir - add external overflow/venting and fill port, ditch the electrical tape!
    • Label the external connections (12v in and the foot switch use the same connectors)
    • CYD - add FP2 control and monitoring

    Planned future upgrades 

    • Better case
    • Check the debug ports on the ZVS board - if serial out use this to build a nice UI combined with the FP2 info
    • Interchangeable coils