Before starting a project, it is key to boil down the requirements: exactly what is the point, or goal of the project. Here are the requirements for this project:
- Determine the common municipal water contaminants that consumers are worried about.
- List methods for filtering each contaminant.
- Identify filter media types and life cycles.
- Identify system flows that can increase life of media.
- Design filter housings.
- Design filter system flow for my specific need.
- Identify control methods and implimentation.
Discussions
Become a Hackaday.io Member
Create an account to leave a comment. Already have an account? Log In.