-
We're Gonna Need A Bigger Hole
07/14/2021 at 04:36 • 0 commentsSo now that I have the reference post, I realized that my holes were slightly off. So today I expanded the overall hole to enable the next two posts to be placed square with the reference post. I also wasn't satisfied with the post hole for my reference post, so I added a few inches to the diameter of the other post holes.
Tomorrow I will try to place the posts and keep them as close to square as possible. My theory is that the distance between the two post corners should be close to the calculated diagonal distance from my plans. I got really annoyed with FreeCAD, and I was too tired to do trigonometry, so I spent about a minute sketching the post placement in Inkscape so I could measure the interior corner-to-corner diagonal distance.
Obviously this isn't going to be accurate enough to be exactly 74.95", but we'll call it 75" +/- 0.5" and hope for the best. Which probably means I'll be posting about I couldn't achieve that precision either without digging even more :-)
-
Reference Post
07/14/2021 at 04:31 • 0 commentsI really want to try to get the posts close to square, so I'm going to use this as my reference post. From here I hope I can measure and square the next two posts, followed by the final corner.
-
Roots..Why did it have to be roots (and clay)?
07/11/2021 at 00:45 • 0 commentsAs someone pointed out, 18" deep for the 4x4 posts might not be enough to handle the high winds of Colorado. So I am now at least 6" under grade for my lower "deck" supports, and I increased the depth of the post holes to 24" (plus the 6" below grade). The most annoying aspect of this decision was dealing with the immense number of roots and the sticky clay that I had to manually scrape off my post hole digger blades each time I brought them up. At least my shoulders are stronger now!
-
Digging Begins!
07/09/2021 at 05:40 • 0 commentsDigging begins! The supplies are finally supposed to be delivered tomorrow after more than a month delay.