The basic concept of the XY axis is ready and should be finished soon. The linear rail on the Z axis changed from a MGN12 to a HGR15. X and Y will use HGR20 rails.
It will use SFU1605 Ballscrews to move X and Y.


The most important part for me is getting everything ready for wire EDM and I already have some ideas for the design.
Discussions
Become a Hackaday.io Member
Create an account to leave a comment. Already have an account? Log In.