Work in progress!
This was assembled in a rush from stuff I had laying around as I just wanted to get forging.
Next up is:
- Add and wire up the missing fan
- Tidy up internal wiring
- Hose clamps!
- Sort out the reservoir - add external overflow/venting and fill port, ditch the electrical tape!
- Label the external connections (12v in and the foot switch use the same connectors)
- CYD - add FP2 control and monitoring
Planned future upgrades
- Better case
- Check the debug ports on the ZVS board - if serial out use this to build a nice UI combined with the FP2 info
- Interchangeable coils