The Smart Grid Test Facility is an educational tool for engineering students, facilitating in-class
experiments, demonstrations, and active learning. Students in power and electric energy
courses can study grid elements using this test bench, which includes a collection of fixed
generators, variable loads, a transmission line network, and sensors feeding into a visual display.

The overall technical approach involves breaking down the small-scale grid into its main
components: generation, transmission, loads, and metrics. These facets are integrated to create a classroom-friendly power grid, made mobile by being affixed to a cart.

Further, this project provides the infrastructure for future integration of Smart Grid components, devices used to improve grid efficiency through communication networks. Ultimately, this project will help engineering students learn about the power grid and how it reacts to various arrangements of generators, loads, and wiring networks.

Project Purpose

The Smart Grid Test Facility is designed to introduce engineering students to how a power grid works. The motivation behind this type of project is the current global challenges associated with fossil-based power generation. In order to adapt to renewable energy technologies, engineers must be familiar with the functionality of the power grid and the role of clean energy systems. Professor Horenstein, who instructs the university’s Power Electronics course along with other power and energy-related courses, formed this project. This test facility is expected to be used for experiments and demonstrations primarily in Power Electronics and Electric Energy Systems.

Features

  • Interactive and modular
  • User-friendly and safe user interface
  • Three single-phase generators
  • Real-grid transmission line simulation
  • Variable RLC loads
  • Versatile data collection system
  • Automatic frequency stability
  • Manual frequency control

Generation System

Per our customer requirements, it was crucial for the generation design to portray the mechanisms of power generation. In approaching this problem, we turned to a less efficient yet a more representative way of generating power for our grid. A single main generation point consists of a DC motor driving an alternator as well as a transformer used to step-down the output voltage. Due to various limitations, only two main generation points are made use of in the design. The third generation point is established through an AC/AC power supply, a simple yet useful addition to the grid generation, which also serves as the reference generator. In totality, the grid is supplied with power from three independent sources that are synchronized in phase and frequency.

In any power system, as loads and generators change, power flow of the system changes. Therefore, our test facility is equipped with a frequency feedback system that stabilizes the three generators at 60Hz at 12Vpp. Students can change the simulated length of transmission line lengths in addition to load values and the system voltage and frequency will return to nominal values naturally. In order to ensure that the generators are synchronized upon startup, our test bench includes synchronization circuits that take two out-of-phase 60Hz sine waves and synchronizes them into one 60Hz, 12Vpp wave.

Transmission Lines

The transmission network is the backbone of the grid. It provides the electrical connections between generators and load points. On the power grid, transmission lines exhibit a characteristic impedance. The project’s transmission circuit boards model real-world line resistance, inductance, and capacitance over various distances. The purpose is to demonstrate the actual line losses associated with a three-generator transmission scheme as the mode of power transport.

Load Network

The modern electrical grid can readily be reduced into a system of sources, transmission lines, and loads. For every sized grid network the connection points for loads are found at the junctions between transmission lines, as such the loads provided with the test facility are designed bearing this connection configuration in mind. More so, these loads that have been provided with the system are modeled at high values (three orders of magnitude above the transmission lines) to simulate the relative power loss as power flows from generator to ground through a loaded network. Three basic loads are included with the test facility (resistive, inductive, and capacitive), each with an 8-bit binary setting allowing for each load to take 255 different values. In addition to these consumers, a model CITGO sign has been included that is backlit with LEDs as a representation of a luminous power consumer on the grid.

Data Acquisition System

In order to provide for experimentation and testing, this test facility includes a data acquisition system involving a LABJACK U3-LV and MATLAB that collects data from arbitrary points in the grid and provides key data points such as RMS voltage, RMS current,...

Read more »

  • 2 × MSP-EXP430G2 Evaluation, Demonstration Kits, Boards and Modules / Evaluation Kits, Boards and Modules
  • 6 × LM2937ESX-5.0 Power Management ICs / Linear Voltage Regulators and LDOs
  • 6 × TL082IDR Amplifier and Linear ICs / Operational Amplifiers
  • 6 × TL084IDR Amplifier and Linear ICs / Operational Amplifiers

  • 1
    Step 1

    User's Guide

    1. Plug the orange cord into a wall outlet (120V, 60Hz) to power the cart and its systems

    2. Turn on the reference generator to power the grid network

    3. Turn on one mechanical generator and synchronize it to the grid

    4. Turn on the other mechanical generator and synchronize it to the grid; now, all three generators are feeding into the grid simultaneously

    5. The grid is up and running--play! Students can learn about the behavior of the power grid in multiple ways:

    a) Change transmission line lengths by changing the switches on the transmission line PCBs

    b) Plug in loads on the grid using the variable resistive, inductive, and capacitive loads or the LED load

    c) Simulate outages by cutting power from a generator, cutting power to a transmission line or load, or shorting a line

    6. While changing various components along the grid, monitor a collection of nodes and use the MATLAB interface to observe voltage and current waveforms and monitor power factor and phase angle

    7. To de-energize the grid, turn off the 24V DC power supply to turn off the mechanical generators, then turn off the reference generator

    8. Unplug the orange cord and safely wrap the cord back onto the cart

View all instructions

Enjoy this project?

Share

Discussions

Don R-Crenshaw wrote 12/05/2016 at 15:37 point

Very cool project. The Science Museum of Minnesota has a similar simulation but more elaborate including adding solar and wind to the grid, turning pumped storage (water and pressurized air), and manipulating grid usage. While that exhibit is aimed at the middle school and below education level, it incorporates many of the concepts included here. Good on you for leveling up!

  Are you sure? yes | no

Similar Projects

Does this project spark your interest?

Become a member to follow this project and never miss any updates