-
CONSTRUCTION OF THE NEW STUDY PROFILE
10/09/2016 at 12:48 • 1 comment -
INSTALATION OF A PRE-TESTING CHAMBER FLOW RECTIFIER PANEL
08/18/2016 at 15:57 • 0 commentsMaking use of the remaining material of the panel rectifier of the acelerator cone, we have decided to use it to make a new panel rectifier that we will place between the exit of the machine of smoke and of the testing chamber.
With this new panel we want to rectify moreover the flow.
We have placed it in the section of the stabilizer between two frames of packing plastic to make sure that it remains fixed and the does not suck it the fan.
-
WIND TUNNEL FAN WORKING
07/11/2016 at 12:44 • 0 comments -
FINISHED THE SMOKE MACHINE
07/10/2016 at 23:58 • 0 comments -
FINISHED THE STRUCTURE TO HOLD THE FULL TUNNEL BODY
07/10/2016 at 17:36 • 0 commentsSome details of the design have changed at the time of constructing it, as the distribution of the wheels and the structure that holds the parts of the tunnel of fiberglass.
-
FINISHED AND PAINTED THE WIND TUNNEL FIBER GLASS BODY
07/06/2016 at 17:43 • 0 comments -
FINISHED THE STRUCTURE PATTERN FOR OUR WIND TUNNEL
07/05/2016 at 09:49 • 0 comments -
AERODYNAMIC STUDY RESULTS WITH ABAQUS
07/05/2016 at 09:36 • 0 comments- The results of speed and pressure correspond to the due results.
- The turbulencies results and vorticiity enter in the permitted range.