Double wall construction, the future NOW
09/09/2018 at 00:05 • 0 comments -
Passive house construction in Central Vancouver Island
09/07/2018 at 17:44 • 1 comment -
The Passive house build all in one place
07/27/2018 at 17:20 • 0 comments -
A recap from the foundations up
05/25/2018 at 20:01 • 0 comments -
Polishing and sealing the concrete pad
05/25/2018 at 19:58 • 0 comments -
Laying the concrete pad with narration
05/25/2018 at 00:28 • 0 comments -
Sealing all air leakage joints in the insulation before the laying the concrete pad
05/25/2018 at 00:26 • 0 comments -
Router used to place the electrical conduit in the insulation
05/25/2018 at 00:23 • 0 comments -
adding the single plastic piping water lines in the insulation with a Router
05/25/2018 at 00:21 • 0 comments -
Framing the double wall construction/headers and adding the sheating
05/21/2018 at 02:48 • 0 comments