At last
09/08/2015 at 10:38 • 0 comments...the long awaited pulleys arrived:
I only need one of these, but I was waiting for these a while.
The only thing still missing for the transmission is the tension spring, but I can build the thing without it. I should order the required mirror in the local shop quickly.
-
Electronics working
09/06/2015 at 04:03 • 0 commentsFinally, the electronics of the project started to wok.
I wrote the whole code in TI CCS. It is a long. I put incredible amount of work into it. ~30 lines of code including declarations, in around 10 mins :-D
Then I tried to set the current limit of the stepper driver. Almost fried it when I connected the required 12V onto the 3.3V power rail but survived. Luckily the MCU was not already in the socket.
Used this video for the setup:
As the whole circuit started to work from my Lab PSU, finally soldered the power supply in. Last check. Still works:
What left:
- Some wiring
- Tweaking the motor speed and the micro stepping
- Minimal mechanical things like timing belt mount, mounting clamps, end stop insert, etc.
- Mounting the lighting
- Finishing the belt drive
There is one thing set me back, that the driving pulley and the belt tension spring didn't arrived yet. As some things I ordered together with it, and things I ordered weeks later already arrived, I'm quite sure, that the bloody Post lost them. Already ordered some from different suppliers, and will complain when the time come.
So, I'm waiting....
-
Components coming slowly
08/31/2015 at 14:09 • 0 commentsSlowly the components are arriving (hopefully all of them will be here in a few days).
The post(wo)man arrived with this today:
-
Advancing further
08/30/2015 at 06:05 • 0 commentsI almost finished the woodwork, the PCB have been soldered, except the power supply part (I don't want to do this until I see the stepper driver running correctly, the transformer just screwed in to be able to do the woodcut correctly).
Here is the device.
Closed:
Open:
I would love to do a video while it's moving, but the MCU programming, and the cabling isn't finished yet, and unfortunately some of the moving parts are still missing.
-
Getting Closer
08/26/2015 at 08:27 • 2 commentsThere is an aluminum frame of the device:
I made it during the weekend. It is almost finished. The only thing is missing from the frame the two L shaped piece, what I'll use the mount it.
I also made some supports for the optical endstops:
The other things need to be done:
- Etch the board
- Build the electronics
- Write the code
- Mount the electronics to the frame
- Cut out the place of the electronics/stepper from the LDF insert
- Mount the insert to the sliders
- Mount the lighting, etc. to the insert
- Order the mirror
- Mount the mirror to the insert
- Mount the pulley to the stepper, add the timing belt, spanner, etc. (most of them not arrived yet)
- Connect everything together
- Mount the device to it's final place